Hi readers! If you are looking for a Project Charter for Six Sigma, you’re in the right place. In this article, I will explain the contents of the Project Charter in detail. You can download the Project Charter template for free from here. Let us understand the Project Charter first
What is Project Charter?
Project Charter is a critical document in the Six Sigma methodology. it serves as a roadmap for Six Sigma projects.
Key Elements of a Six Sigma Project Charter
- Project Title
- Problem Statement
- Goals & Objective
- Scope of the Project
- Project Champion
- Project leader
- Team members
- CTQ, Measure & Specification, defect definition
- Financial benefits
- Project Time lime of DMAIC
- Customer Benefit
Suppose ABC is a plastic molding company that manufactures plastic Container boxes. The organization is facing significant issues, including in-house product rejection, yield improvement, and defects. Consequently, the Chief of the plant has tasked the Head of Production with initiating a Six Sigma project to address the in-house product rejection problem and reduce rejection rates. Now, the Head of Production needs to prepare a Project Charter for the Six Sigma project
1. Project Title – Reduce the Inhouse rejection of finished Container box | |||||||
2. Problem Statement – Shift Quality Inspectors are complaining that shrinkage & white stress mark are found in finished container box at assembly line. Container box rejection is 1.8% per month. The problem is very complex and there are too many variables affecting aesthetic view. | |||||||
3. Goals & Objective – Reduce the Inhouse rejection by 50% from 1.8% to 0.9% at final assembly line. | |||||||
4. Scope of the Project – Reduction Inhouse rejection in Assembly line -1. | |||||||
5. Project Champion – Mr. B. Peter | |||||||
6. Project Leader – Mr. S. Patel | |||||||
7. Team members – Mr. K Jones, Mr. T Roy, Mr. R. Joshi, Mr. P. Donald | |||||||
8. CTQ | Measure & Specification | Defect Definition | |||||
Reduce the defect (Shrinkage and White Stress mark) | Visual inspection (Ok & Not ok Product ) | Visual acceptance criteria not meeting with defined SOP | |||||
9. Financial benefits (Annual) – Expected Cost saving Rs. 12 Lacs/ Year | |||||||
10.Project Time lime of DMAIC | |||||||
Phase Schedule | Define | Measure | Analyze | Improve | Control | ||
11.Customer Benefit |